REAL

History of construction of the hydroelectric power plant at Ikervár

Lesz, Éva (2008) History of construction of the hydroelectric power plant at Ikervár. Pollack Periodica, 3 (2). pp. 111-117. ISSN 1788-1994

[img] Text
pollack.3.2008.2.10.pdf
Restricted to Repository staff only until 31 August 2028.

Download (154kB)

Abstract

The present study introduces the construction history of the first hydroelectric power plant in Hungary, the power plant at Ikervár, which produced electricity using the power of water.

Item Type: Article
Subjects: T Technology / alkalmazott, műszaki tudományok > TA Engineering (General). Civil engineering (General) / általános mérnöki tudományok
Depositing User: Erika Bilicsi
Date Deposited: 28 Oct 2017 08:15
Last Modified: 28 Oct 2017 08:15
URI: http://real.mtak.hu/id/eprint/66326

Actions (login required)

Edit Item Edit Item