Eliminating the adverse effects of overweight transports to bridges-an example

Szatmári, Tibor (2012) Eliminating the adverse effects of overweight transports to bridges-an example. Pollack Periodica, 7 (2). pp. 59-68. ISSN 1788-1994

[img] Text
pollack.7.2012.2.5.pdf
Restricted to Repository staff only until 31 August 2032.

Download (617kB)

Abstract

BORSODCHEM is a supplier of chemical raw materials. In 2009, BORSODCHEM ordered a chemical reactor — measuring 4.5 m wide, 4.5 m high and weighing 160 tons — from Japan.The reactor was shipped in one piece from Japan to Rotterdam, then through inland waterways to Bodrogkeresztúr, where it was unloaded.Bodrogkeresztúr is 80 km from Kazincbarcika destination. Load-bearing capacity of 31 bridges along the route had to be verified. Bridges failing verification had to be temporarily supported, ensuring the passage of transport, with no damage to bridges.This article describes the peculiarities of the job.

Item Type: Article
Subjects: T Technology / alkalmazott, műszaki tudományok > TA Engineering (General). Civil engineering (General) / általános mérnöki tudományok
Depositing User: Erika Bilicsi
Date Deposited: 02 Nov 2017 19:18
Last Modified: 02 Nov 2017 19:18
URI: http://real.mtak.hu/id/eprint/66770

Actions (login required)

Edit Item Edit Item