REAL

Activities with multi-parameters in time-cost trade-off

Csordas, Helga (2011) Activities with multi-parameters in time-cost trade-off. Pollack Periodica, 6 (2). pp. 37-48. ISSN 1788-1994

[img] Text
pollack.6.2011.2.4.pdf
Restricted to Repository staff only until 31 August 2031.

Download (265kB)

Abstract

Network models are often applied in project management. In Time — Cost Trade-Off time and cost parameters are assigned to the activities. At first it has to decide what kind of technology and resources will be applied, which determine the parameters. Typically there is not only one proper technology for realize the engineering object. In this paper a known time-cost trade-off based on maximal flow algorithm is generalized by integrating the possibility of applying multi-parameters. This algorithm chooses automatically the optimal technology for all the activities in the model.

Item Type: Article
Subjects: T Technology / alkalmazott, műszaki tudományok > TA Engineering (General). Civil engineering (General) / általános mérnöki tudományok
Depositing User: Erika Bilicsi
Date Deposited: 03 Nov 2017 12:14
Last Modified: 03 Nov 2017 12:14
URI: http://real.mtak.hu/id/eprint/66819

Actions (login required)

Edit Item Edit Item