REAL

Items where Author is "Kis, Tamás"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 23.

Györgyi, Péter and Kis, Tamás (2017) Approximation schemes for parallel machine scheduling with non-renewable resources. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 258 (1). pp. 113-123. ISSN 0377-2217

Horváth, Markó and Kis, Tamás (2017) Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH. ISSN 1435-246X (In Press)

Egri, Péter and Kis, Tamás (2017) Serial Dictatorship Mechanism for Project Scheduling with Non-Renewable Resources. JOURNAL OF ARTIFICIAL INTELLIGENCE RESEARCH. ISSN 1076 - 9757 (Submitted)

Madarasi, Péter and Kis, Tamás (2017) Exact methods for the Strip Packing problem. Project Report. UNSPECIFIED. (Unpublished)

Györgyi, Péter and Kis, Tamás (2017) Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut. Computers & Industrial Engineering. ISSN 0360-8352 (Submitted)

Györgyi, Péter and Kis, Tamás (2017) A probabilistic approach to pickup and delivery problems with time window uncertainty. Transportation Science. ISSN 0041-1655 (Submitted)

Horváth, Markó and Kis, Tamás (2017) Multi-criteria approximation schemes for the resource constrained shortest path problem. OPTIMIZATION LETTERS. ISSN 1862-4472 (Submitted)

Balas, Egon and Kis, Tamás (2016) On the relationship between standard intersection cuts, lift-and-project cuts, and generalized intersection cuts. MATHEMATICAL PROGRAMMING, 160. pp. 85-114. ISSN 0025-5610

Horváth, Markó and Kis, Tamás (2016) Solving resource constrained shortest path problems with LP-based methods. Computers & Operations Research, 73. pp. 150-164. ISSN 0305-0548

Györgyi, Péter and Kis, Tamás (2015) Approximability of scheduling problems with resource consuming jobs. Annals of Operations Research, 235. pp. 319-336. ISSN 0254-5330

Kis, Tamás (2015) Approximability of total weighted completion time with resource consuming jobs. Operations Research Letters, 43. 595-598. ISSN 0167-6377

Györgyi, Péter and Kis, Tamás (2015) Reductions between scheduling problems with non-renewable resources and knapsack problems. THEORETICAL COMPUTER SCIENCE, 565 (2). pp. 63-76. ISSN 0304-3975

Drótos, Márton and Kis, Tamás (2015) Planning and scheduling in the digital factory. In: Math for the Digital Factory. Springer. (Submitted)

Györgyi, Péter and Kis, Tamás (2015) Approximability of scheduling problems with resource consuming jobs. ANNALS OF OPERATIONS RESEARCH, 235. pp. 319-336. ISSN 0254-5330

Balas, Egon and Kis, Tamás (2015) Intersection cuts -- standard versus restricted. DISCRETE OPTIMIZATION, 18. pp. 189-192. ISSN 1572-5286

Drótos, Márton and Kis, Tamás (2014) Car Sequencing with respect to Regular Expressions and Linear Bounds. In: IFAC World Congress, 2014, Augusztus 24-29., Cape Town.

Györgyi, Péter and Kis, Tamás (2014) Approximation schemes for single machine scheduling with non-renewable resource constraints. Journal of Scheduling, 17 (2). pp. 135-144. ISSN 1094-6136

Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József (2014) An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters. International Journal of Production Economics, 149. pp. 80-88. ISSN 0925-5273

Kis, Tamás (2014) Lift-and-project for general two-term disjunctions. Discrete Optimization, 12. pp. 98-114. ISSN 1572-5286

Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József (2013) Inventory control in supply chains: alternative approaches to a two-stage lot-sizing problem. International Journal of Production Economics, 143 (2). pp. 385-394. ISSN 0925-5273

Drótos, Márton and Kis, Tamás (2013) Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times. Journal of Scheduling, 16 (3). pp. 337-346. ISSN 1094-6136

Kis, Tamás and Kovács, András (2013) Exact solution approaches for bilevel lot-sizing. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 226 (2). pp. 237-245. ISSN 0377-2217

Váncza, József and Kis, Tamás and Kovács, András and Márkus, András (2007) Új projekt ütemezési módszerek a termelés-tervezés támogatására = New project scheduling approaches for production planning. Project Report. OTKA.

This list was generated on Mon Oct 23 04:40:59 2017 CEST.