Györgyi, Péter and Kis, Tamás (2015) Reductions between scheduling problems with non-renewable resources and knapsack problems. THEORETICAL COMPUTER SCIENCE, 565 (2). pp. 63-76. ISSN 0304-3975 (Submitted)
![]() | There is a more recent version of this item available. |
|
Text
r1.pdf Download (452kB) | Preview |
Official URL: https://dx.doi.org/10.1016/j.tcs.2014.11.007
Abstract
In this paper we establish approximation preserving reductions between scheduling problems in which jobs either consume some raw materials, or produce some intermediate products, and variants of the knapsack problem. Through the reductions, we get new approximation algorithms, as well as inapproximability results for the scheduling problems.
Item Type: | Article |
---|---|
Subjects: | Q Science / természettudomány > QA Mathematics / matematika Q Science / természettudomány > QA Mathematics / matematika > QA75 Electronic computers. Computer science / számítástechnika, számítógéptudomány |
Depositing User: | Dr. Tamás Kis |
Date Deposited: | 21 Oct 2015 08:35 |
Last Modified: | 21 Oct 2015 08:35 |
URI: | http://real.mtak.hu/id/eprint/29887 |
Available Versions of this Item
-
Reductions between scheduling problems with non-renewable resources and knapsack problems. (deposited 14 Sep 2014 18:55)
- Reductions between scheduling problems with non-renewable resources and knapsack problems. (deposited 21 Oct 2015 08:35) [Currently Displayed]
Actions (login required)
![]() |
Edit Item |