Mihály, Krisztián and Kulcsárné Forrai, Mónika and Kulcsár, Gyula (2021) Experimental Implementation of a Resource-Constrained Multi-Project Scheduling Problem Solver. HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 49 (2). pp. 53-58. ISSN 0133-0276
|
Text
1144-ArticleText-1202-1-10-20220208.pdf Download (371kB) | Preview |
Abstract
Nowadays, project-based planning and execution are becoming more and more important in product life cycles; from the conceptual idea and its design to manufacturing and maintenance. Companies execute several projects simultaneously and these projects usually share the same resources resulting in conflicting situations. Since all projects have different requirements, constraints and goals that need to be achieved, the creation of a company-wide optimal schedule is difficult if all the aspects of each project are to be taken into consideration. Our paper presents an extended model and a scheduling problem-solving approach for resource-constrained, multi-project scheduling problems. In addition to defining the theoretical solution, its experimental implementation and results are presented.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | resource-constrained, multi-project, advanced project scheduling, ABAP |
Subjects: | T Technology / alkalmazott, műszaki tudományok > TA Engineering (General). Civil engineering (General) / általános mérnöki tudományok |
SWORD Depositor: | MTMT SWORD |
Depositing User: | MTMT SWORD |
Date Deposited: | 04 Apr 2024 08:46 |
Last Modified: | 04 Apr 2024 08:46 |
URI: | https://real.mtak.hu/id/eprint/191585 |
Actions (login required)
![]() |
Edit Item |