Bányai, Tamás (2023) Logistics-based design of collection system for asbeston-containing roof structures. ADVANCED LOGISTIC SYSTEMS: THEORY AND PRACTICE, 17 (3). pp. 59-67. ISSN 1789-2198
|
Text
ALS17_No3_p59_67_BanyaiT_2.pdf - Published Version Download (219kB) | Preview |
Abstract
Asbestos-containing roofing materials are an increasing hazard, which justifies their replacement by environmentally friendly roofing materials. Replacements can be carried out on an individual initiative basis, but a coordinated, systemic replacement will have a more significant impact. In order for such systemic asbestos removal to be successful from economics and logistics point of view, it is necessary to plan the associated logistics processes, as asbestos removal generates a significant transportation demand due to the large amount of waste generated. In the framework of this paper, the author presents an algorithm to plan the logistic process of centralized asbestos removal. A simple calculation method is presented to determine the cost of collection.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | asbestos-containing roofing materials, replacement, logistics design, cost function |
Subjects: | T Technology / alkalmazott, műszaki tudományok > T2 Technology (General) / műszaki tudományok általában T Technology / alkalmazott, műszaki tudományok > TD Environmental technology. Sanitary engineering / környezetvédelem, hulladékkezelés, egészségügyi mérnöki technika (ivóvízellátási és szennyvízkezelési technika) |
SWORD Depositor: | MTMT SWORD |
Depositing User: | MTMT SWORD |
Date Deposited: | 25 Apr 2024 12:48 |
Last Modified: | 25 Apr 2024 12:48 |
URI: | https://real.mtak.hu/id/eprint/193193 |
Actions (login required)
![]() |
Edit Item |