REAL

Project indicators and flexible project structure generators

Kosztyán, Zsolt Tibor and Novák, Gergely L. (2023) Project indicators and flexible project structure generators. JOURNAL OF COMPUTATIONAL SCIENCE, 75. no.-102203. ISSN 1877-7503

[img]
Preview
Text
Project indicators and flexible project structure generators.pdf - Published Version
Available under License Creative Commons Attribution.

Download (1MB) | Preview

Abstract

Project indicators are essential in characterizing project structures, structural complexity, duration, slacks, and resource demands. This information can fundamentally influence how the scheduling or resource allocation algorithm performs. In addition, most of these indicators assume a fixed project structure, while recent project management approaches, such as agile, hybrid, and extreme approaches, consider the priority of task completion and flexible precedence between tasks. By specifying the desired level of flexibility, the flexible structure generator (FSG) can transform conventional project database instances into flexible instances. This transformation allows scholars to analyze the various implemented project indicators in a flexible project environment. The generation of the specified minimal and maximal structure variants serves to bridge the gap between traditional and emerging flexible project scheduling algorithms.

Item Type: Article
Uncontrolled Keywords: Project generator, Structural flexibility, Project indicators, Matrix-based project structures
Subjects: H Social Sciences / társadalomtudományok > H Social Sciences (General) / társadalomtudomány általában
Depositing User: Dr Bernadett Gaál
Date Deposited: 17 Nov 2026 14:54
Last Modified: 17 Nov 2026 14:54
URI: https://real.mtak.hu/id/eprint/250188

Actions (login required)

View Item View Item