Items where Author is "Láng, Blanka"
Group by: Item Type | No Grouping Jump to: Article Number of items: 3. ArticleCsébfalvi, Anikó and Láng, Blanka (2012) An improved hybrid method for the resource-constrained project scheduling problem with discounted cash flows. Pollack Periodica, 7 (1). pp. 135-146. ISSN 1788-1994 Láng, Blanka (2010) A robust hybrid method for the resource-constrained project scheduling problem with discounted cash flows. Pollack Periodica, 5 (3). pp. 167-174. ISSN 1788-1994 Láng, Blanka (2009) A nettó jelenérték maximalizálása erőforrás-korlátos projektekben : Egy új harmóniakereső metaheurisztika. VEZETÉSTUDOMÁNY, 40 (10). pp. 55-61. ISSN 0133-0179 |