Items where Author is "Szendrői, Etelka"
Group by: Item Type | No Grouping Number of items: 2. Szendrői, Etelka (2010) A robust hybrid method for the multimode resource-constrained project scheduling problem. Pollack Periodica, 5 (3). pp. 175-184. ISSN 1788-1994 Szendrői, Etelka and Torjai, László (2008) Decision support application for design and management of energy-grass supply chain. Pollack Periodica, 3 (1). pp. 41-52. ISSN 1788-1994 |