REAL

Items where Author is "Kis, Tamás"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 30.

Article

Lénárt, Lea and Horváth, András and Kis, Tamás and Buják, Dávid and Szenci, Ottó (2023) Effect of postpartum drenching on rumination time and reticuloruminal pH at a Hungarian dairy farm. ACTA VETERINARIA HUNGARICA, 71 (1). pp. 46-53. ISSN 0236-6290

Györgyi, Péter and Kis, Tamás (2022) New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints. DISCRETE APPLIED MATHEMATICS, 311. pp. 97-109. ISSN 0166-218X

Kis, Tamás and Kovács, András and Mészáros, Csaba (2021) On optimistic and pessimistic cases of bilevel electricity tariff optimization. Energies, 14 (8). p. 2095. ISSN 1996-1073

Drótos, Márton and Györgyi, Péter and Horváth, Markó and Kis, Tamás (2021) Suboptimal and conflict-free control of a fleet of AGVs to serve online requests. COMPUTERS AND INDUSTRIAL ENGINEERING, 152. ISSN 0360-8352

Györgyi, Péter and Kis, Tamás (2020) A common approximation framework for early work, late work, and resource leveling problems. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 286 (1). pp. 129-137. ISSN 0377-2217

Györgyi, Péter and Kis, Tamás (2017) Approximation schemes for parallel machine scheduling with non-renewable resources. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 258 (1). pp. 113-123. ISSN 0377-2217

Horváth, Markó and Kis, Tamás (2017) Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH. ISSN 1435-246X (In Press)

Györgyi, Péter and Kis, Tamás (2017) Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut. Computers & Industrial Engineering. ISSN 0360-8352 (Submitted)

Horváth, Markó and Kis, Tamás (2017) Multi-criteria approximation schemes for the resource constrained shortest path problem. OPTIMIZATION LETTERS. ISSN 1862-4472 (Submitted)

Balas, Egon and Kis, Tamás (2016) On the relationship between standard intersection cuts, lift-and-project cuts, and generalized intersection cuts. MATHEMATICAL PROGRAMMING, 160. pp. 85-114. ISSN 0025-5610

Horváth, Markó and Kis, Tamás (2016) Solving resource constrained shortest path problems with LP-based methods. Computers & Operations Research, 73. pp. 150-164. ISSN 0305-0548

Györgyi, Péter and Kis, Tamás (2015) Approximability of scheduling problems with resource consuming jobs. Annals of Operations Research, 235. pp. 319-336. ISSN 0254-5330

Kis, Tamás (2015) Approximability of total weighted completion time with resource consuming jobs. Operations Research Letters, 43. 595-598. ISSN 0167-6377

Györgyi, Péter and Kis, Tamás (2015) Reductions between scheduling problems with non-renewable resources and knapsack problems. THEORETICAL COMPUTER SCIENCE, 565 (2). pp. 63-76. ISSN 0304-3975

Györgyi, Péter and Kis, Tamás (2015) Approximability of scheduling problems with resource consuming jobs. ANNALS OF OPERATIONS RESEARCH, 235. pp. 319-336. ISSN 0254-5330

Balas, Egon and Kis, Tamás (2015) Intersection cuts -- standard versus restricted. DISCRETE OPTIMIZATION, 18. pp. 189-192. ISSN 1572-5286

Györgyi, Péter and Kis, Tamás (2014) Approximation schemes for single machine scheduling with non-renewable resource constraints. Journal of Scheduling, 17 (2). pp. 135-144. ISSN 1094-6136

Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József (2014) An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters. International Journal of Production Economics, 149. pp. 80-88. ISSN 0925-5273

Kis, Tamás (2014) Lift-and-project for general two-term disjunctions. Discrete Optimization, 12. pp. 98-114. ISSN 1572-5286

Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József (2013) Inventory control in supply chains: alternative approaches to a two-stage lot-sizing problem. International Journal of Production Economics, 143 (2). pp. 385-394. ISSN 0925-5273

Drótos, Márton and Kis, Tamás (2013) Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times. Journal of Scheduling, 16 (3). pp. 337-346. ISSN 1094-6136

Kis, Tamás and Kovács, András (2013) Exact solution approaches for bilevel lot-sizing. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 226 (2). pp. 237-245. ISSN 0377-2217

Book Section

Drótos, Márton and Kis, Tamás (2015) Planning and scheduling in the digital factory. In: Math for the Digital Factory. Springer. (Submitted)

Monograph

Györgyi, Péter and Kis, Tamás (2018) A probabilistic approach to pickup and delivery problems with time window uncertainty. Other. UNSPECIFIED, Budapest. (Submitted)

Horváth, Markó and Kis, Tamás (2018) Polyhedral results for position based scheduling of chains on a single machine. Other. UNSPECIFIED. (Submitted)

Györgyi, Péter and Kis, Tamás (2017) Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints. Other. UNSPECIFIED. (Submitted)

Egri, Péter and Kis, Tamás (2017) Serial Dictatorship Mechanism for Project Scheduling with Non-Renewable Resources. Other. UNSPECIFIED. (Submitted)

Madarasi, Péter and Kis, Tamás (2017) Exact methods for the Strip Packing problem. Project Report. UNSPECIFIED. (Unpublished)

Váncza, József and Kis, Tamás and Kovács, András and Márkus, András (2007) Új projekt ütemezési módszerek a termelés-tervezés támogatására = New project scheduling approaches for production planning. Project Report. OTKA.

Conference or Workshop Item

Drótos, Márton and Kis, Tamás (2014) Car Sequencing with respect to Regular Expressions and Linear Bounds. In: IFAC World Congress, 2014, Augusztus 24-29., Cape Town.

This list was generated on Tue Mar 19 12:41:32 2024 CET.