REAL

Staffing and human resource assignment in U-shaped production cells

Bányai, Tamás and Kaczmar, Ireneusz (2024) Staffing and human resource assignment in U-shaped production cells. ADVANCED LOGISTIC SYSTEMS: THEORY AND PRACTICE, 18 (1). pp. 5-14. ISSN 1789-2198

[img]
Preview
Text
ALS18_No1_p5_14_Banyai_Kaczmar.pdf - Published Version

Download (249kB) | Preview

Abstract

Today, U-shaped production cells play an important role in manufacturing, as their flexibility allows for highly efficient production with a small number of operators. Since the cost of human resources has a significant impact on the total cost of the overall production process and the assignment of operators to tasks can have a major impact on the efficiency of the production process, it is important to develop design methods that allow the assignment of resources to tasks in a way that maximizes the efficiency of the U-cell manufacturing system. In this paper, the authors present a mathematical model for assigning operators to task sets using different objective functions. Calculations based on the presented mathematical model demonstrate that, given a suitable choice of objective functions, it is possible to determine an optimal operator-task assignment that can improve the efficiency of the manufacturing system.

Item Type: Article
Uncontrolled Keywords: assignment, human resource optimisation, U-shaped production cells, cost efficiency, productivity, logistics process
Subjects: K Law / jog > KF26.L27 Human resources (HR) management / Humán erőforrás menedzsment
SWORD Depositor: MTMT SWORD
Depositing User: MTMT SWORD
Date Deposited: 03 Dec 2024 13:52
Last Modified: 03 Dec 2024 13:52
URI: https://real.mtak.hu/id/eprint/210762

Actions (login required)

Edit Item Edit Item