Kosztyán, Zsolt Tibor and Novák, Gergely Lajos (2024) Exploring Indicators for Multiple Modes in Resource-Constrained Project Scheduling. In: 26th International Dependency and Structure Modeling Conference, DSM, 2024, Stuttgart.
|
Text
Exploring Indicators_ocr.pdf - Published Version Download (3MB) | Preview |
Abstract
Project scheduling is a critical aspect across various industries that is still extensively studied. Unlike project plans for the resource—constrained project scheduling problem, those in the multi-mode extension (MRCPSP) remain relatively unexplored regarding project characteristics and their implications. The present study explores artificial project plans featuring multiple modes to address this gap. The lower and upper bounds are determined for the adapted project-related indicator groups using metaheuristic optimization as a mode selection strategy. Our approach contributes by offering insights into the multi-mode context and characteristics influencing project scheduling and managerial decisions.
| Item Type: | Conference or Workshop Item (Lecture) |
|---|---|
| Uncontrolled Keywords: | project scheduling, multi-mode, project databases, project indicators, MRSCPSP |
| Subjects: | H Social Sciences / társadalomtudományok > H Social Sciences (General) / társadalomtudomány általában H Social Sciences / társadalomtudományok > HB Economic Theory / közgazdaságtudomány |
| Depositing User: | Dr Bernadett Gaál |
| Date Deposited: | 18 Nov 2026 12:46 |
| Last Modified: | 18 Nov 2026 12:46 |
| URI: | https://real.mtak.hu/id/eprint/250217 |
Actions (login required)
![]() |
View Item |




